Period close: September 2026

Finish the checks, agree summaries to their detail, deal with the open estimate, sign off and lock. After the lock, changes go through an approved adjustment.

1. Close checklist, by owner

A check is ticked by its owner. Ticking here changes the page only; in production each tick would carry the user and time and appear in the audit log.

2. Summaries matched to their detail

Same scope, same date
AreaSummarySummary figureDetailDetail totalDifferenceStatus

3. Estimate bridge

Company P&L
StepTreatment at closeStatusAmount

4. Lock demonstration: try to edit a September entry

EntryWhatDatedKindAmountState
WhenWhoEntryPeriod stateResultReason shown to the user

5. Adjustment after the lock

    RequestEntryChangeRouteReasonStatus

    Adjustment history

    AdjustmentPeriodEntryBeforeAfterWhyRequested byApproved byWhenHow it was posted
    The original entry is never overwritten: the history keeps who asked, who approved, when, why, and the amount before and after.

    Sign-off and lock

      Who does what at close

      All roles
      RoleMay edit while openLockRequestApprove
      Static in the prototype: the page checks the role you pick, not a signed-in user.